Assessment Year | 2017 |
---|---|
Principal Product | Hard disk drive components |
NAICS | 334112: Computer Storage Device Manufacturing |
SIC | 3572: Computer Storage Devices |
Sales Range | $10 M to 50M |
# of Employees | 75 |
Plant Area |
27,000
ft2
|
Annual Production | 70,000,000
units
|
Production Hrs. Annual | 3,900
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $190,051 | 1,110,806 |
kWh
|
$0.17 |
Natural Gas | $3,802 | 3,213 |
MMBtu
|
$1.18 |
TOTAL YEARLY COSTS | $193,853 | |||
RECOMMENDED SAVINGS* | $64,008 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $6,518 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|
01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $43,867 | $5,775 |
$53,735
314,053
kWh
|
$(-9,868.0)
-
MMBtu
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,848 | $25,956 |
$7,631
44,595
kWh
|
- | $217 | |
03 | 2.4133: Use most efficient type of electric motors | $3,188 | $9,450 |
$3,188
18,634
kWh
|
- | - | |
04 | 2.4239: Eliminate or reduce compressed air usage | $2,587 | $3,500 |
$2,587
15,120
kWh
|
- | - | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,478 | $600 |
$2,478
14,483
kWh
|
- | - | |
06 | 2.7135: Install occupancy sensors | $1,570 | $1,860 |
$1,570
9,179
kWh
|
- | - | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,245 | $900 |
$1,245
7,274
kWh
|
- | - | |
08 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,225 | $3,775 |
$1,225
7,160
kWh
|
- | - | |
TOTAL RECOMMENDED | $64,008 | $51,816 |
$73,659
430,498
kWh
|
$(-9,868.0)
-
MMBtu
|
$217 | ||
TOTAL IMPLEMENTED | $6,518 | $7,135 |
$6,518
38,096
kWh
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs