ITAC Assessment: SD0556
ITAC logo
ITAC Assessment: SD0556
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Turbine component repair
NAICS 336412: Aircraft Engine and Engine Parts Manufacturing
SIC 3724: Aircraft Engines and Engine Parts
Sales Range $10
M
to 50
M
# of Employees 121
Plant Area 100,000
ft2
Annual Production 92,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $561,059 5,764,411
kWh
Electricity Demand $429,988 14,128
kW-mo/yr
Electricity Fees $(-54,560.0) -
Natural Gas $43,393 6,271
MMBtu
TOTAL YEARLY COSTS $979,880
RECOMMENDED SAVINGS* $212,829 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $138,725

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.3132: Recharge batteries on during off-peak demand periods $57,756 $205,000 $(-4,425.0)
(-45,625)
kWh
$62,181
-
kW-mo/yr
- -
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $36,675 $3,790 $34,560
355,187
kWh
$14,094
-
kW-mo/yr
$(-11,979.0)
-
MMBtu
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $23,797 $36,600 $23,797
244,571
kWh
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $20,198 $27,633 $11,549
118,696
kWh
$8,206
-
kW-mo/yr
- $443
05 2.7232: Replace existing hvac unit with high efficiency model $20,046 $53,400 $10,810
111,139
kWh
$9,236
-
kW-mo/yr
- -
06 2.2514: Cover open tanks $18,591 $10,800 $18,591
191,061
kWh
- - -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $17,514 $21,100 $17,514
180,004
kWh
- - -
08 2.4322: Use or replace with energy efficient substitutes $5,696 $2,740 $5,696
58,542
kWh
- - -
09 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,278 $16,770 $4,278
43,974
kWh
- - -
10 2.4239: Eliminate or reduce compressed air usage $3,658 $10,285 $3,658
37,590
kWh
- - -
11 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,718 $1,300 $2,718
27,930
kWh
- - -
12 2.4231: Reduce the pressure of compressed air to the minimum required $1,902 $200 $1,902
19,551
kWh
- - -
TOTAL RECOMMENDED $212,829 $389,618 $130,648
1,342,620
kWh
$93,717
-
kW-mo/yr
$(-11,979.0)
-
MMBtu
$443
TOTAL IMPLEMENTED $138,725 $319,433 $58,659
602,756
kWh
$79,623
-
kW-mo/yr
- $443
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs