Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Scientific Instrumentation
NAICS 334516: Analytical Laboratory Instrument Manufacturing
SIC 3826: Laboratory Analytical Instruments
Sales Range $50
M
to 100
M
# of Employees 35
Plant Area 100,000
ft2
Annual Production 140
units
Production Hrs. Annual 3,060
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $445,496 3,714,374
kWh
Electricity Demand $176,948 5,032
kW-mo/yr
Electricity Fees $10,242 -
TOTAL YEARLY COSTS $632,686
RECOMMENDED SAVINGS* $47,728 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $36,665

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
01 2.3132: Recharge batteries on during off-peak demand periods $30,343 $65,600 $(-1,750.0)
(-14,600)
kWh
$32,093
-
kW-mo/yr
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $8,849 $4,785 $8,849
73,805
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $5,421 $15,275 $2,143
17,854
kWh
$3,201
-
kW-mo/yr
$77
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,214 $2,470 $2,214
18,466
kWh
- -
05 2.4231: Reduce the pressure of compressed air to the minimum required $356 $1,450 $356
2,966
kWh
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $274 $1,300 $274
2,290
kWh
- -
07 2.4231: Reduce the pressure of compressed air to the minimum required $271 $200 $271
2,260
kWh
- -
TOTAL RECOMMENDED $47,728 $91,080 $12,357
103,041
kWh
$35,294
-
kW-mo/yr
$77
TOTAL IMPLEMENTED $36,665 $83,825 $1,294
10,770
kWh
$35,294
-
kW-mo/yr
$77
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs