Assessment Year | 2017 |
---|---|
Principal Product | Scientific Instrumentation |
NAICS | 334516: Analytical Laboratory Instrument Manufacturing |
SIC | 3826: Laboratory Analytical Instruments |
Sales Range | $50 M to 100M |
# of Employees | 35 |
Plant Area |
100,000
ft2
|
Annual Production | 140
units
|
Production Hrs. Annual | 3,060
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $445,496 | 3,714,374 |
kWh
|
$0.12 |
Electricity Demand | $176,948 | 5,032 |
kW-mo/yr
|
$35.17 |
Electricity Fees | $10,242 | - |
|
- |
TOTAL YEARLY COSTS | $632,686 | |||
RECOMMENDED SAVINGS* | $47,728 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $36,665 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|
01 | 2.3132: Recharge batteries on during off-peak demand periods | $30,343 | $65,600 |
$(-1,750.0)
(-14,600)
kWh
|
$32,093
-
kW-mo/yr
|
- | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $8,849 | $4,785 |
$8,849
73,805
kWh
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,421 | $15,275 |
$2,143
17,854
kWh
|
$3,201
-
kW-mo/yr
|
$77 | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,214 | $2,470 |
$2,214
18,466
kWh
|
- | - | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $356 | $1,450 |
$356
2,966
kWh
|
- | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $274 | $1,300 |
$274
2,290
kWh
|
- | - | |
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $271 | $200 |
$271
2,260
kWh
|
- | - | |
TOTAL RECOMMENDED | $47,728 | $91,080 |
$12,357
103,041
kWh
|
$35,294
-
kW-mo/yr
|
$77 | ||
TOTAL IMPLEMENTED | $36,665 | $83,825 |
$1,294
10,770
kWh
|
$35,294
-
kW-mo/yr
|
$77 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs