ITAC Assessment: SD0547
ITAC logo
ITAC Assessment: SD0547
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Data Center Cabinets
NAICS 332510: Hardware Manufacturing
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 38,000
ft2
Annual Production 9,000
units
Production Hrs. Annual 6,240
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $100,736 878,920
kWh
Electricity Demand $39,164 2,877
kW-mo/yr
Electricity Fees $21,318 -
Natural Gas $53,920 9,384
MMBtu
TOTAL YEARLY COSTS $215,138
RECOMMENDED SAVINGS* $17,183 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,712

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $5,853 $20,582 $4,617
40,292
kWh
$1,082
-
kW-mo/yr
- $154
02 2.7134: Use photocell controls $3,679 $11,568 $3,558
31,054
kWh
$121
-
kW-mo/yr
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,165 $1,500 $3,165
27,616
kWh
- - -
04 2.7135: Install occupancy sensors $1,746 $2,045 $1,746
15,236
kWh
- - -
05 2.2511: Insulate bare equipment $1,326 $750 $(-79.0)
(-686)
kWh
$(-33.0)
-
kW-mo/yr
$1,438
-
MMBtu
-
06 2.4239: Eliminate or reduce compressed air usage $725 $914 $725
6,322
kWh
- - -
07 2.4133: Use most efficient type of electric motors $689 $567 $558
4,868
kWh
$131
-
kW-mo/yr
- -
TOTAL RECOMMENDED $17,183 $37,926 $14,290
124,702
kWh
$1,301
-
kW-mo/yr
$1,438
-
MMBtu
$154
TOTAL IMPLEMENTED $14,712 $34,967 $11,819
103,144
kWh
$1,301
-
kW-mo/yr
$1,438
-
MMBtu
$154
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs