| Assessment Year | 2017 |
|---|---|
| Principal Product | Generic Liquid OTC Drug Products |
| NAICS | 325411: Medicinal and Botanical Manufacturing |
| SIC | 2834: Pharmaceutical Preparations |
| Sales Range | $50 M to 100M |
| # of Employees | 200 |
| Plant Area |
240,000
ft2
|
| Annual Production | 8,000,000
units
|
| Production Hrs. Annual | 6,200
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $226,649 | 3,073,333 |
kWh
|
$0.074 |
| Electricity Demand | $172,816 | 8,773 |
kW-mo/yr
|
$19.70 |
| Electricity Fees | $57,476 | - |
|
- |
| Natural Gas | $59,552 | 9,719 |
MMBtu
|
$6.13 |
| TOTAL YEARLY COSTS | $516,493 | |||
| RECOMMENDED SAVINGS* | $36,538 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $16,314 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $14,252 | $40,625 |
$11,324
153,655
kWh
|
$2,928
-
kW-mo/yr
|
|
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $11,279 | $33,276 |
$7,434
100,856
kWh
|
$3,845
-
kW-mo/yr
|
|
| 03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $5,972 | $8,850 |
$5,972
81,031
kWh
|
- | |
| 04 | 2.7135: Install occupancy sensors | $3,536 | $6,060 |
$3,536
48,003
kWh
|
- | |
| 05 | 2.2511: Insulate bare equipment | $954 | $449 |
$759
10,298
kWh
|
$195
-
kW-mo/yr
|
|
| 06 | 2.4239: Eliminate or reduce compressed air usage | $545 | $914 |
$545
7,397
kWh
|
- | |
| TOTAL RECOMMENDED | $36,538 | $90,174 |
$29,570
401,240
kWh
|
$6,968
-
kW-mo/yr
|
||
| TOTAL IMPLEMENTED | $16,314 | $40,699 |
$12,274
166,554
kWh
|
$4,040
-
kW-mo/yr
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs