ITAC Assessment: SD0545
ITAC logo
ITAC Assessment: SD0545
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Generic Liquid OTC Drug Products
NAICS 325411: Medicinal and Botanical Manufacturing
SIC 2834: Pharmaceutical Preparations
Sales Range $50
M
to 100
M
# of Employees 200
Plant Area 240,000
ft2
Annual Production 8,000,000
units
Production Hrs. Annual 6,200
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $226,649 3,073,333
kWh
Electricity Demand $172,816 8,773
kW-mo/yr
Electricity Fees $57,476 -
Natural Gas $59,552 9,719
MMBtu
TOTAL YEARLY COSTS $516,493
RECOMMENDED SAVINGS* $36,538 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,314

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7121: Utilize daylight whenever possible in lieu of artificial light $14,252 $40,625 $11,324
153,655
kWh
$2,928
-
kW-mo/yr
02 2.7142: Utilize higher efficiency lamps and/or ballasts $11,279 $33,276 $7,434
100,856
kWh
$3,845
-
kW-mo/yr
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,972 $8,850 $5,972
81,031
kWh
-
04 2.7135: Install occupancy sensors $3,536 $6,060 $3,536
48,003
kWh
-
05 2.2511: Insulate bare equipment $954 $449 $759
10,298
kWh
$195
-
kW-mo/yr
06 2.4239: Eliminate or reduce compressed air usage $545 $914 $545
7,397
kWh
-
TOTAL RECOMMENDED $36,538 $90,174 $29,570
401,240
kWh
$6,968
-
kW-mo/yr
TOTAL IMPLEMENTED $16,314 $40,699 $12,274
166,554
kWh
$4,040
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs