ITAC Assessment: SD0540
ITAC logo
ITAC Assessment: SD0540
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Adhesives and Sealants
NAICS 325520: Adhesive Manufacturing
SIC 2891: Adhesives and Sealants
Sales Range $10
M
to 50
M
# of Employees 57
Plant Area 125,000
ft2
Annual Production 42,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $143,054 1,950,307
kWh
Electricity Demand $146,052 5,759
kW-mo/yr
Electricity Fees $7,947 -
Natural Gas $12,896 1,955
MMBtu
TOTAL YEARLY COSTS $309,949
RECOMMENDED SAVINGS* $128,185 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.7121: Utilize daylight whenever possible in lieu of artificial light $42,256 $168,000 $13,438
183,325
kWh
$28,818
-
kW-mo/yr
- -
02 2.3137: Use power during off-peak periods $33,558 $136,000 $(-1,372.0)
(-18,720)
kWh
$35,930
-
kW-mo/yr
$(-1,000.0) -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $22,953 $11,528 $13,783
188,030
kWh
$9,170
-
kW-mo/yr
- -
04 2.2614: Use cooling tower or economizer to replace chiller cooling $17,767 $20,883 $1,988
27,118
kWh
$15,779
-
kW-mo/yr
- -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,414 $16,180 $2,679
36,546
kWh
$1,735
-
kW-mo/yr
- -
06 2.7134: Use photocell controls $2,234 $7,400 $2,022
27,590
kWh
$212
-
kW-mo/yr
- -
07 2.3212: Optimize plant power factor $1,665 $5,360 - - $1,665 -
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,457 $1,100 $503
6,862
kWh
$954
-
kW-mo/yr
- -
09 2.7241: Install outside air damper / economizer on hvac unit $950 $2,520 - - - $950
-
MMBtu
10 2.4231: Reduce the pressure of compressed air to the minimum required $931 $200 $931
12,699
kWh
- - -
TOTAL RECOMMENDED $128,185 $369,171 $33,972
463,450
kWh
$92,598
-
kW-mo/yr
$665 $950
-
MMBtu
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs