Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Thermoset Compounds
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 35
Plant Area 72,000
ft2
Annual Production 493,364
lb
Production Hrs. Annual 2,210
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $80,916 651,342
kWh
Electricity Demand $60,622 3,778
kW-mo/yr
Electricity Fees $7,420 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $93,140 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $93,140

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
01 2.1336: Install equipment to utilize waste fuel $38,152 $147,781 $22,985
185,062
kWh
$15,167
-
kW-mo/yr
-
02 2.7425: Clean or color roof to reduce solar load $17,463 $69,877 $14,850
119,567
kWh
$2,613
-
kW-mo/yr
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $16,883 $11,174 $9,839
79,215
kWh
$7,044
-
kW-mo/yr
-
04 2.7232: Replace existing hvac unit with high efficiency model $11,728 $24,400 $6,833
55,022
kWh
$4,895
-
kW-mo/yr
-
05 2.4226: Use / purchase optimum sized compressor $3,236 $1,000 - $3,236
-
kW-mo/yr
-
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,188 $1,500 $1,408
11,337
kWh
$780
-
kW-mo/yr
-
07 2.4231: Reduce the pressure of compressed air to the minimum required $1,341 $700 $1,341
10,802
kWh
- -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $1,304 $3,171 $680
5,473
kWh
$470
-
kW-mo/yr
$154
09 2.4111: Utilize energy-efficient belts and other improved mechanisms $845 $36 $492
3,963
kWh
$353
-
kW-mo/yr
-
TOTAL RECOMMENDED $93,140 $259,639 $58,428
470,441
kWh
$34,558
-
kW-mo/yr
$154
TOTAL IMPLEMENTED $93,140 $259,639 $58,428
470,441
kWh
$34,558
-
kW-mo/yr
$154
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs