ITAC Assessment: SD0515
ITAC logo
ITAC Assessment: SD0515
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product aircraft structures
NAICS 332312: Fabricated Structural Metal Manufacturing
SIC 3441: Fabricated Structural Metal
Sales Range $50
M
to 100
M
# of Employees 500
Plant Area 1,150,000
ft2
Annual Production 50,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,628,052 21,827,094
kWh
Electricity Demand $716,901 46,063
kW-mo/yr
Electricity Fees $169,215 -
Natural Gas $218,442 31,217
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $444,762 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $209,960 $1,040,000 $210,385
3,853,200
kWh
$121,368
-
kW-mo/yr
$(-121,793.0)
-
MMBtu
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $163,675 $32,788 $147,736
1,980,379
kWh
$75,061
-
kW-mo/yr
$(-59,122.0)
-
MMBtu
03 2.7232: Replace existing hvac unit with high efficiency model $49,380 $151,600 $32,173
431,281
kWh
$17,207
-
kW-mo/yr
-
04 2.4321: Upgrade obsolete equipment $9,105 $25,000 $7,078
94,881
kWh
$2,027
-
kW-mo/yr
-
05 2.4322: Use or replace with energy efficient substitutes $5,959 $12,000 $5,959
79,886
kWh
- -
06 2.4133: Use most efficient type of electric motors $3,564 $5,290 $2,317
31,037
kWh
$1,247
-
kW-mo/yr
-
07 2.4239: Eliminate or reduce compressed air usage $1,240 $1,550 $530
7,110
kWh
$710
-
kW-mo/yr
-
08 2.4323: Use optimum size and capacity equipment $948 $3,375 $(-569.0)
(-7,622)
kWh
$(-163.0)
-
kW-mo/yr
$1,680
-
MMBtu
09 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $931 $3,050 $668
8,960
kWh
$263
-
kW-mo/yr
-
TOTAL RECOMMENDED $444,762 $1,274,653 $406,277
6,479,112
kWh
$217,720
-
kW-mo/yr
$(-179,235.0)
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs