ITAC Assessment: SD0514
ITAC logo
ITAC Assessment: SD0514
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Ceramic circuit boards
NAICS 334418: Printed Circuit Assembly (Electronic Assembly) Manufacturing
SIC 3679: Electronic Components, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 53,000
ft2
Annual Production 10,000
pieces
Production Hrs. Annual 4,590
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $373,215 3,816,481
kWh
Electricity Demand $283,871 7,799
kW-mo/yr
Electricity Fees $(-274.0) -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $230,051 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $227,715

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $188,380 $121,434 $150,471
1,538,568
kWh
$73,209
-
kW-mo/yr
$(-35,300.0)
-
MMBtu
02 2.6241: Reduce temperature of process equipment when on standby $34,024 $1,200 $34,024
347,872
kWh
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,935 $2,000 $1,363
13,938
kWh
$1,572
-
kW-mo/yr
-
04 2.7135: Install occupancy sensors $2,376 $3,380 $2,376
24,299
kWh
- -
05 2.4231: Reduce the pressure of compressed air to the minimum required $2,336 $400 $2,336
23,883
kWh
- -
TOTAL RECOMMENDED $230,051 $128,414 $190,570
1,948,560
kWh
$74,781
-
kW-mo/yr
$(-35,300.0)
-
MMBtu
TOTAL IMPLEMENTED $227,715 $128,014 $188,234
1,924,677
kWh
$74,781
-
kW-mo/yr
$(-35,300.0)
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs