ITAC Assessment: SD0506
ITAC logo
ITAC Assessment: SD0506
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product High Pressure Aluminum Cylinders
NAICS 339112: Surgical and Medical Instrument Manufacturing
SIC 3354: Aluminum Extruded Products
Sales Range $10
M
to 50
M
# of Employees 153
Plant Area 100,000
ft2
Annual Production 100,000
units
Production Hrs. Annual 8,400
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $508,340 6,284,927
kWh
Electricity Demand $136,988 13,056
kW-mo/yr
Electricity Fees $22,725 -
Natural Gas $199,378 31,470
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $23,874 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,402

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $8,173 $100 $8,173
101,028
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,408 $600 $4,563
56,398
kWh
$845
-
kW-mo/yr
03 2.7121: Utilize daylight whenever possible in lieu of artificial light $281 $100 $281
3,478
kWh
-
04 2.4133: Use most efficient type of electric motors $2,431 $2,923 $2,053
25,381
kWh
$378
-
kW-mo/yr
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,973 $9,260 $3,973
49,100
kWh
-
06 2.7145: Install skylights $3,045 $6,027 $2,569
31,752
kWh
$476
-
kW-mo/yr
07 2.7135: Install occupancy sensors $563 $1,476 $563
6,965
kWh
-
TOTAL RECOMMENDED $23,874 $20,486 $22,175
274,102
kWh
$1,699
-
kW-mo/yr
TOTAL IMPLEMENTED $8,402 $4,999 $7,179
88,744
kWh
$1,223
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs