Assessment Year | 2011 |
---|---|
Principal Product | High Pressure Aluminum Cylinders |
NAICS | 339112: Surgical and Medical Instrument Manufacturing |
SIC | 3354: Aluminum Extruded Products |
Sales Range | $10 M to 50M |
# of Employees | 153 |
Plant Area |
100,000
ft2
|
Annual Production | 100,000
units
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $508,340 | 6,284,927 |
kWh
|
$0.081 |
Electricity Demand | $136,988 | 13,056 |
kW-mo/yr
|
$10.49 |
Electricity Fees | $22,725 | - |
|
- |
Natural Gas | $199,378 | 31,470 |
MMBtu
|
$6.34 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $23,874 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $8,402 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $8,173 | $100 |
$8,173
101,028
kWh
|
- | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,408 | $600 |
$4,563
56,398
kWh
|
$845
-
kW-mo/yr
|
|
03 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $281 | $100 |
$281
3,478
kWh
|
- | |
04 | 2.4133: Use most efficient type of electric motors | $2,431 | $2,923 |
$2,053
25,381
kWh
|
$378
-
kW-mo/yr
|
|
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,973 | $9,260 |
$3,973
49,100
kWh
|
- | |
06 | 2.7145: Install skylights | $3,045 | $6,027 |
$2,569
31,752
kWh
|
$476
-
kW-mo/yr
|
|
07 | 2.7135: Install occupancy sensors | $563 | $1,476 |
$563
6,965
kWh
|
- | |
TOTAL RECOMMENDED | $23,874 | $20,486 |
$22,175
274,102
kWh
|
$1,699
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $8,402 | $4,999 |
$7,179
88,744
kWh
|
$1,223
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs