ITAC Assessment: SD0500
ITAC logo
ITAC Assessment: SD0500
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product pills and tablets
NAICS 325412: Pharmaceutical Preparation Manufacturing
SIC 2834: Pharmaceutical Preparations
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 155,767
ft2
Annual Production 1,000,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,181,248 14,816,280
kWh
Electricity Demand $758,869 27,881
kW-mo/yr
Electricity Fees $20,606 -
Natural Gas $363,436 55,494
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $457,355 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $437,942

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $326,647 $943,500 $368,111
4,618,710
kWh
$181,285
-
kW-mo/yr
$(-92,374.0) $(-130,375.0)
-
MMBtu
02 2.7232: Replace existing hvac unit with high efficiency model $105,336 $417,200 $45,534
571,305
kWh
$59,802
-
kW-mo/yr
- -
03 2.2625: Chill water to the highest temperature possible $9,500 $500 $6,250
78,420
kWh
$3,250
-
kW-mo/yr
- -
04 2.7111: Reduce illumination to minimum necessary levels $4,982 $3,060 $3,384
42,461
kWh
$1,598
-
kW-mo/yr
- -
05 2.4231: Reduce the pressure of compressed air to the minimum required $4,931 $400 $4,931
61,877
kWh
- - -
06 2.3132: Recharge batteries on during off-peak demand periods $4,651 $500 - $4,651
-
kW-mo/yr
- -
07 2.7134: Use photocell controls $1,308 $2,775 $889
11,155
kWh
$419
-
kW-mo/yr
- -
TOTAL RECOMMENDED $457,355 $1,367,935 $429,099
5,383,928
kWh
$251,005
-
kW-mo/yr
$(-92,374.0) $(-130,375.0)
-
MMBtu
TOTAL IMPLEMENTED $437,942 $1,363,975 $414,534
5,201,170
kWh
$246,157
-
kW-mo/yr
$(-92,374.0) $(-130,375.0)
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs