| Assessment Year | 2015 |
|---|---|
| Principal Product | pills and tablets |
| NAICS | 325412: Pharmaceutical Preparation Manufacturing |
| SIC | 2834: Pharmaceutical Preparations |
| Sales Range | $10 M to 50M |
| # of Employees | 100 |
| Plant Area |
155,767
ft2
|
| Annual Production | 1,000,000
pieces
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $1,181,248 | 14,816,280 |
kWh
|
$0.080 |
| Electricity Demand | $758,869 | 27,881 |
kW-mo/yr
|
$27.22 |
| Electricity Fees | $20,606 | - |
|
- |
| Natural Gas | $363,436 | 55,494 |
MMBtu
|
$6.55 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $457,355 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $437,942 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $326,647 | $943,500 |
$368,111
4,618,710
kWh
|
$181,285
-
kW-mo/yr
|
$(-92,374.0) |
$(-130,375.0)
-
MMBtu
|
|
| 02 | 2.7232: Replace existing hvac unit with high efficiency model | $105,336 | $417,200 |
$45,534
571,305
kWh
|
$59,802
-
kW-mo/yr
|
- | - | |
| 03 | 2.2625: Chill water to the highest temperature possible | $9,500 | $500 |
$6,250
78,420
kWh
|
$3,250
-
kW-mo/yr
|
- | - | |
| 04 | 2.7111: Reduce illumination to minimum necessary levels | $4,982 | $3,060 |
$3,384
42,461
kWh
|
$1,598
-
kW-mo/yr
|
- | - | |
| 05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,931 | $400 |
$4,931
61,877
kWh
|
- | - | - | |
| 06 | 2.3132: Recharge batteries on during off-peak demand periods | $4,651 | $500 | - |
$4,651
-
kW-mo/yr
|
- | - | |
| 07 | 2.7134: Use photocell controls | $1,308 | $2,775 |
$889
11,155
kWh
|
$419
-
kW-mo/yr
|
- | - | |
| TOTAL RECOMMENDED | $457,355 | $1,367,935 |
$429,099
5,383,928
kWh
|
$251,005
-
kW-mo/yr
|
$(-92,374.0) |
$(-130,375.0)
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $437,942 | $1,363,975 |
$414,534
5,201,170
kWh
|
$246,157
-
kW-mo/yr
|
$(-92,374.0) |
$(-130,375.0)
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs