ITAC Assessment: SD0499
ITAC logo
ITAC Assessment: SD0499
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product baked goods
NAICS 311812: Commercial Bakeries
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $50
M
to 100
M
# of Employees 142
Plant Area 155,750
ft2
Annual Production 110,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $928,747 10,224,389
kWh
Electricity Demand $296,995 19,010
kW-mo/yr
Electricity Fees $20,508 -
Natural Gas $115,051 69,557
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $90,932 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,498

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $72,145 $170,000 $75,564
832,200
kWh
$18,744
-
kW-mo/yr
$(-16,644.0) $(-5,519.0)
-
MMBtu
02 2.4231: Reduce the pressure of compressed air to the minimum required $17,182 $200 $17,182
189,226
kWh
- - -
03 2.4133: Use most efficient type of electric motors $904 $3,025 $698
7,688
kWh
$206
-
kW-mo/yr
- -
04 2.4239: Eliminate or reduce compressed air usage $412 $1,300 $334
3,670
kWh
$78
-
kW-mo/yr
- -
05 2.2511: Insulate bare equipment $289 $975 - - - $289
-
MMBtu
TOTAL RECOMMENDED $90,932 $175,500 $93,778
1,032,784
kWh
$19,028
-
kW-mo/yr
$(-16,644.0) $(-5,230.0)
-
MMBtu
TOTAL IMPLEMENTED $18,498 $4,525 $18,214
200,584
kWh
$284
-
kW-mo/yr
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs