Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product pumps, steam traps, valves
NAICS
n/a
SIC 3433: Heating Equipment, Except Electric and Warm Air Furnaces
Sales Range $10
M
to 50
M
# of Employees 110
Plant Area 110,000
ft2
Annual Production 180,000
pieces
Production Hrs. Annual 2,380
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $72,267 860,492
kWh
Natural Gas $53,535 14,611
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,103 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,641

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4239: Eliminate or reduce compressed air usage $2,467 $30 $2,467
29,308
kWh
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,121 $400 $1,121
13,482
kWh
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,520 $185 $1,520
18,171
kWh
04 2.7134: Use photocell controls $554 $275 $554
6,741
kWh
05 2.7135: Install occupancy sensors $441 $693 $441
5,275
kWh
TOTAL RECOMMENDED $6,103 $1,583 $6,103
72,977
kWh
TOTAL IMPLEMENTED $2,641 $585 $2,641
31,653
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs