ITAC Assessment: OR0137
ITAC logo
ITAC Assessment: OR0137
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product PINE PARTICLE BOARD
NAICS
n/a
SIC 2493: Reconstituted Wood Products
Sales Range $10
M
to 50
M
# of Employees 185
Plant Area
n/a
Annual Production 166,000
thousand feet
Production Hrs. Annual 8,736
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,359,013 35,362,251
kWh
Natural Gas $142,414 37,872
MMBtu
Wood $488,380 397,056
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $69,391 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,141

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $538 - $538
12,603
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,349 - $2,867
74,443
kWh
- $(-518.0)
03 2.3212: Optimize plant power factor $9,452 $20,250 $9,452
-
kWh
- -
04 2.4133: Use most efficient type of electric motors $1,689 $5,934 $1,689
42,790
kWh
- -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,962 $14,175 $2,962
78,253
kWh
- -
06 2.3413: Burn fossil fuel to produce steam to drive a steam turbine-generator and use steam exhaust for heat $52,401 - $158,814
4,381,301
kWh
$(-53,853.0)
-
MMBtu
$(-52,560.0)
TOTAL RECOMMENDED $69,391 $40,359 $176,322
4,589,390
kWh
$(-53,853.0)
-
MMBtu
$(-53,078.0)
TOTAL IMPLEMENTED $11,141 $26,184 $11,141
42,790
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs