Assessment Year | 2014 |
---|---|
Principal Product | electrical transformers |
NAICS | 334416: Capacitor, Resistor, Coil, Transformer, and Other Inductor Manufacturing |
SIC | 3679: Electronic Components, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 75 |
Plant Area |
50,000
ft2
|
Annual Production | 750,000
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $225,871 | 2,293,102 |
kWh
|
$0.099 |
Electricity Demand | $101,626 | 8,527 |
kW-mo/yr
|
$11.92 |
Electricity Fees | $65,663 | - |
|
- |
Natural Gas | $12,104 | 1,471 |
MMBtu
|
$8.23 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $176,500 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $23,181 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $153,319 | $210,684 |
$156,295
1,586,737
kWh
|
$52,720
-
kW-mo/yr
|
$(-55,696.0)
-
MMBtu
|
|
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $15,158 | $34,531 |
$12,272
124,569
kWh
|
$2,886
-
kW-mo/yr
|
- | |
03 | 2.2511: Insulate bare equipment | $3,880 | $1,527 |
$3,202
32,510
kWh
|
$678
-
kW-mo/yr
|
- | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,731 | $4,350 |
$2,512
25,500
kWh
|
$219
-
kW-mo/yr
|
- | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $881 | $1,791 |
$881
8,949
kWh
|
- | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $531 | $400 |
$437
4,334
kWh
|
$94
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $176,500 | $253,283 |
$175,599
1,782,599
kWh
|
$56,597
-
kW-mo/yr
|
$(-55,696.0)
-
MMBtu
|
||
TOTAL IMPLEMENTED | $23,181 | $42,599 |
$19,304
195,862
kWh
|
$3,877
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs