Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product electrical transformers
NAICS 334416: Capacitor, Resistor, Coil, Transformer, and Other Inductor Manufacturing
SIC 3679: Electronic Components, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area 50,000
ft2
Annual Production 750,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $225,871 2,293,102
kWh
Electricity Demand $101,626 8,527
kW-mo/yr
Electricity Fees $65,663 -
Natural Gas $12,104 1,471
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $176,500 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $23,181

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $153,319 $210,684 $156,295
1,586,737
kWh
$52,720
-
kW-mo/yr
$(-55,696.0)
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $15,158 $34,531 $12,272
124,569
kWh
$2,886
-
kW-mo/yr
-
03 2.2511: Insulate bare equipment $3,880 $1,527 $3,202
32,510
kWh
$678
-
kW-mo/yr
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,731 $4,350 $2,512
25,500
kWh
$219
-
kW-mo/yr
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $881 $1,791 $881
8,949
kWh
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $531 $400 $437
4,334
kWh
$94
-
kW-mo/yr
-
TOTAL RECOMMENDED $176,500 $253,283 $175,599
1,782,599
kWh
$56,597
-
kW-mo/yr
$(-55,696.0)
-
MMBtu
TOTAL IMPLEMENTED $23,181 $42,599 $19,304
195,862
kWh
$3,877
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs