ITAC Assessment: SD0490
ITAC logo
ITAC Assessment: SD0490
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Mexican Chorizo
NAICS 311612: Meat Processed from Carcasses
SIC 2013: Sausages and Other Prepared Meat Products
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 42,000
ft2
Annual Production 3,000,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $144,615 1,584,960
kWh
Electricity Demand $76,388 7,761
kW-mo/yr
Electricity Fees $18,116 -
Natural Gas $24,321 3,120
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,087 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,363

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $9,150 $3,300 $7,413
81,284
kWh
$4,251
-
kW-mo/yr
$(-2,514.0)
-
MMBtu
02 2.2414: Use waste heat from hot flue gases to preheat $1,842 $5,480 - - $1,842
-
MMBtu
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,773 $3,775 $1,468
16,099
kWh
$305
-
kW-mo/yr
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,633 $500 $1,633
17,909
kWh
- -
05 2.7135: Install occupancy sensors $730 $867 $730
8,005
kWh
- -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $519 $1,550 $480
5,261
kWh
$39
-
kW-mo/yr
-
07 2.4231: Reduce the pressure of compressed air to the minimum required $440 $200 $440
4,821
kWh
- -
TOTAL RECOMMENDED $16,087 $15,672 $12,164
133,379
kWh
$4,595
-
kW-mo/yr
$(-672.0)
-
MMBtu
TOTAL IMPLEMENTED $11,363 $7,275 $9,321
102,204
kWh
$4,556
-
kW-mo/yr
$(-2,514.0)
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs