Assessment Year | 2014 |
---|---|
Principal Product | Mexican Chorizo |
NAICS | 311612: Meat Processed from Carcasses |
SIC | 2013: Sausages and Other Prepared Meat Products |
Sales Range | $10 M to 50M |
# of Employees | 60 |
Plant Area |
42,000
ft2
|
Annual Production | 3,000,000
pieces
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $144,615 | 1,584,960 |
kWh
|
$0.091 |
Electricity Demand | $76,388 | 7,761 |
kW-mo/yr
|
$9.84 |
Electricity Fees | $18,116 | - |
|
- |
Natural Gas | $24,321 | 3,120 |
MMBtu
|
$7.79 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $16,087 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $11,363 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $9,150 | $3,300 |
$7,413
81,284
kWh
|
$4,251
-
kW-mo/yr
|
$(-2,514.0)
-
MMBtu
|
|
02 | 2.2414: Use waste heat from hot flue gases to preheat | $1,842 | $5,480 | - | - |
$1,842
-
MMBtu
|
|
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,773 | $3,775 |
$1,468
16,099
kWh
|
$305
-
kW-mo/yr
|
- | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,633 | $500 |
$1,633
17,909
kWh
|
- | - | |
05 | 2.7135: Install occupancy sensors | $730 | $867 |
$730
8,005
kWh
|
- | - | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $519 | $1,550 |
$480
5,261
kWh
|
$39
-
kW-mo/yr
|
- | |
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $440 | $200 |
$440
4,821
kWh
|
- | - | |
TOTAL RECOMMENDED | $16,087 | $15,672 |
$12,164
133,379
kWh
|
$4,595
-
kW-mo/yr
|
$(-672.0)
-
MMBtu
|
||
TOTAL IMPLEMENTED | $11,363 | $7,275 |
$9,321
102,204
kWh
|
$4,556
-
kW-mo/yr
|
$(-2,514.0)
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs