Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product treated sewage water
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range less than $500
k
# of Employees 6
Plant Area 600,000
ft2
Annual Production 730,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $132,386 1,953,995
kWh
Electricity Demand $53,047 4,355
kW-mo/yr
Electricity Fees $3,626 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $88,765 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $33,419

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $55,346 $151,250 $76,171
1,123,470
kWh
$16,443
-
kW-mo/yr
$(-37,268.0)
-
MMBtu
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $13,532 $99,966 $1,536
-
kWh
$11,996
-
kW-mo/yr
-
03 2.4321: Upgrade obsolete equipment $9,337 $35,560 $9,337
137,709
kWh
- -
04 3.1192: Reduce scrap production $4,795 $10,700 $3,779
55,742
kWh
$1,016
-
kW-mo/yr
-
05 2.4131: Size electric motors for peak operating efficiency $3,282 $9,400 $2,895
42,702
kWh
$387
-
kW-mo/yr
-
06 2.4131: Size electric motors for peak operating efficiency $2,473 $2,350 $1,985
29,270
kWh
$488
-
kW-mo/yr
-
TOTAL RECOMMENDED $88,765 $309,226 $95,703
1,388,893
kWh
$30,330
-
kW-mo/yr
$(-37,268.0)
-
MMBtu
TOTAL IMPLEMENTED $33,419 $157,976 $19,532
265,423
kWh
$13,887
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs