Assessment Year | 2014 |
---|---|
Principal Product | aerospace clamps |
NAICS | 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing |
SIC | 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 255 |
Plant Area |
88,000
ft2
|
Annual Production | 100,000
pieces
|
Production Hrs. Annual | 5,434
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $259,309 | 3,386,554 |
kWh
|
$0.077 |
Electricity Demand | $246,981 | 9,979 |
kW-mo/yr
|
$24.75 |
Electricity Fees | $33,312 | - |
|
- |
Natural Gas | $32,375 | 4,545 |
MMBtu
|
$7.12 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $191,062 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.7233: Use properly designed and sized hvac equipment | $75,586 | $286,300 |
$63,933
834,645
kWh
|
$11,653
-
kW-mo/yr
|
|
02 | 2.7425: Clean or color roof to reduce solar load | $54,581 | $250,000 |
$37,904
494,828
kWh
|
$16,677
-
kW-mo/yr
|
|
03 | 3.1192: Reduce scrap production | $29,967 | $30,993 |
$29,967
391,215
kWh
|
- | |
04 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $14,957 | $4,985 | - |
$14,957
-
kW-mo/yr
|
|
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $13,274 | $22,000 |
$10,579
138,112
kWh
|
$2,695
-
kW-mo/yr
|
|
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,270 | $600 |
$1,674
21,855
kWh
|
$596
-
kW-mo/yr
|
|
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $427 | $600 |
$316
4,121
kWh
|
$111
-
kW-mo/yr
|
|
TOTAL RECOMMENDED | $191,062 | $595,478 |
$144,373
1,884,776
kWh
|
$46,689
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs