Assessment Year | 2014 |
---|---|
Principal Product | Beer |
NAICS | 312120: Breweries |
SIC | 2082: Malt Beverages |
Sales Range | $100 M to 500M |
# of Employees | 500 |
Plant Area |
660,000
ft2
|
Annual Production | 6,000,000
bbl
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,798,079 | 29,335,034 |
kWh
|
$0.061 |
Electricity Fees | $743,731 | - |
|
- |
Natural Gas | $2,273,337 | 1,066,915 |
MMBtu
|
$2.13 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $266,514 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $243,755 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | By-product Production Savings |
---|---|---|---|---|---|---|---|
01 | 2.2624: Use cold waste water to cool chiller feed water | $134,111 | $80,720 |
$134,111
2,187,780
kWh
|
- | - | |
02 | 2.7232: Replace existing hvac unit with high efficiency model | $36,872 | $91,000 |
$36,872
601,542
kWh
|
- | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $31,839 | $1,000 |
$31,839
519,397
kWh
|
- | - | |
04 | 2.2422: Use waste heat from hot flue gases to generate steam | $22,759 | $25,200 | - |
$22,759
-
MMBtu
|
- | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $15,116 | $2,600 |
$15,116
246,582
kWh
|
- | - | |
06 | 3.7311: Maintain machines to reduce leaks | $14,877 | $5,000 | - | - | $14,877 | |
07 | 2.4133: Use most efficient type of electric motors | $7,167 | $16,320 |
$7,167
116,974
kWh
|
- | - | |
08 | 2.2135: Repair and eliminate steam leaks | $2,220 | $1,200 | - |
$2,220
-
MMBtu
|
- | |
09 | 2.2136: Install / repair insulation on steam lines | $1,553 | $2,325 | - |
$1,553
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $266,514 | $225,365 |
$225,105
3,672,275
kWh
|
$26,532
-
MMBtu
|
$14,877 | ||
TOTAL IMPLEMENTED | $243,755 | $200,165 |
$225,105
3,672,275
kWh
|
$3,773
-
MMBtu
|
$14,877 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | By-product Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs