Assessment Year | 2013 |
---|---|
Principal Product | APET containers |
NAICS | 326199: All Other Plastics Product Manufacturing |
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 175 |
Plant Area |
178,000
ft2
|
Annual Production | 500,000,000
pieces
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $2,127,293 | 27,153,716 |
kWh
|
$0.078 |
Electricity Demand | $469,705 | 53,911 |
kW-mo/yr
|
$8.71 |
Natural Gas | $132,720 | 26,538 |
MMBtu
|
$5.00 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $623,463 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $82,016 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.3412: Use waste heat to produce steam to drive a steam turbine-generator | $404,689 | $1,152,300 |
$612,304
7,819,980
kWh
|
$100,820
-
kW-mo/yr
|
$(-241,303.0)
-
MMBtu
|
$(-67,132.0) | |
02 | 2.2424: Use heat in flue gases to preheat products or materials | $47,675 | $150,500 |
$42,689
545,203
kWh
|
$4,986
-
kW-mo/yr
|
- | - | |
03 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $44,050 | $30,000 |
$44,050
562,590
kWh
|
- | - | - | |
04 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $40,480 | $35,200 |
$44,377
566,757
kWh
|
$7,897
-
kW-mo/yr
|
$(-11,794.0)
-
MMBtu
|
- | |
05 | 2.2427: Use waste heat from hot flue gases to preheat incoming fluids | $37,276 | $40,200 |
$34,230
437,162
kWh
|
$3,046
-
kW-mo/yr
|
- | - | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $23,678 | $87,264 |
$23,678
302,400
kWh
|
- | - | - | |
07 | 2.2424: Use heat in flue gases to preheat products or materials | $15,779 | $45,500 | - | - |
$15,779
-
MMBtu
|
- | |
08 | 2.7232: Replace existing hvac unit with high efficiency model | $5,576 | $16,500 |
$5,166
65,981
kWh
|
$410
-
kW-mo/yr
|
- | - | |
09 | 2.4133: Use most efficient type of electric motors | $2,172 | $5,250 |
$1,811
23,133
kWh
|
$361
-
kW-mo/yr
|
- | - | |
10 | 2.7134: Use photocell controls | $2,088 | $7,400 |
$2,008
25,651
kWh
|
$80
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $623,463 | $1,570,114 |
$810,313
10,348,857
kWh
|
$117,600
-
kW-mo/yr
|
$(-237,318.0)
-
MMBtu
|
$(-67,132.0) | ||
TOTAL IMPLEMENTED | $82,016 | $88,050 |
$82,426
1,052,703
kWh
|
$11,384
-
kW-mo/yr
|
$(-11,794.0)
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs