| Assessment Year | 2013 |
|---|---|
| Principal Product | Food Coatings |
| NAICS | 333241: Food Product Machinery Manufacturing |
| SIC | 2899: Chemicals and Chemical Preparations, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 35 |
| Plant Area |
50,000
ft2
|
| Annual Production | 1,000,000
pieces
|
| Production Hrs. Annual | 3,395
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $65,358 | 800,000 |
kWh
|
$0.082 |
| Electricity Demand | $26,887 | 2,644 |
kW-mo/yr
|
$10.17 |
| Electricity Fees | $2,188 | - |
|
- |
| Natural Gas | $10,491 | 1,432 |
MMBtu
|
$7.32 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $25,196 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $22,223 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.2622: Replace existing chiller with high efficiency model | $8,265 | $23,840 |
$4,457
54,551
kWh
|
$3,808
-
kW-mo/yr
|
- | - | |
| 02 | 4.454: Modify startup/shutdown times | $7,607 | $1,050 | - | - | - | $7,607 | |
| 03 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $4,278 | $1,600 |
$1,637
15,840
kWh
|
$2,641
-
kW-mo/yr
|
- | - | |
| 04 | 2.2414: Use waste heat from hot flue gases to preheat | $2,973 | $5,650 | - | - |
$2,973
-
MMBtu
|
- | |
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,073 | $700 |
$1,709
20,910
kWh
|
$364
-
kW-mo/yr
|
- | - | |
| TOTAL RECOMMENDED | $25,196 | $32,840 |
$7,803
91,301
kWh
|
$6,813
-
kW-mo/yr
|
$2,973
-
MMBtu
|
$7,607 | ||
| TOTAL IMPLEMENTED | $22,223 | $27,190 |
$7,803
91,301
kWh
|
$6,813
-
kW-mo/yr
|
- | $7,607 | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs