ITAC Assessment: SD0468
ITAC logo
ITAC Assessment: SD0468
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Food Coatings
NAICS 333241: Food Product Machinery Manufacturing
SIC 2899: Chemicals and Chemical Preparations, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 35
Plant Area 50,000
ft2
Annual Production 1,000,000
pieces
Production Hrs. Annual 3,395
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $65,358 800,000
kWh
Electricity Demand $26,887 2,644
kW-mo/yr
Electricity Fees $2,188 -
Natural Gas $10,491 1,432
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $25,196 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $22,223

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.2622: Replace existing chiller with high efficiency model $8,265 $23,840 $4,457
54,551
kWh
$3,808
-
kW-mo/yr
- -
02 4.454: Modify startup/shutdown times $7,607 $1,050 - - - $7,607
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $4,278 $1,600 $1,637
15,840
kWh
$2,641
-
kW-mo/yr
- -
04 2.2414: Use waste heat from hot flue gases to preheat $2,973 $5,650 - - $2,973
-
MMBtu
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,073 $700 $1,709
20,910
kWh
$364
-
kW-mo/yr
- -
TOTAL RECOMMENDED $25,196 $32,840 $7,803
91,301
kWh
$6,813
-
kW-mo/yr
$2,973
-
MMBtu
$7,607
TOTAL IMPLEMENTED $22,223 $27,190 $7,803
91,301
kWh
$6,813
-
kW-mo/yr
- $7,607