Assessment Year | 2013 |
---|---|
Principal Product | Carpet Padding |
NAICS | 326150: Urethane and Other Foam Product (except Polystyrene) Manufacturing |
SIC | 3086: Plastics Foam Products |
Sales Range | $10 M to 50M |
# of Employees | 80 |
Plant Area |
217,156
ft2
|
Annual Production | 430,000
pieces
|
Production Hrs. Annual | 5,500
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $259,968 | 3,349,113 |
kWh
|
$0.078 |
Electricity Demand | $231,981 | 11,917 |
kW-mo/yr
|
$19.47 |
Electricity Fees | $8,947 | - |
|
- |
Natural Gas | $41,537 | 6,478 |
MMBtu
|
$6.41 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $48,592 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $42,172 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 3.1192: Reduce scrap production | $24,055 | $56,924 |
$12,995
167,455
kWh
|
$7,114
-
kW-mo/yr
|
$3,946
-
MMBtu
|
|
02 | 2.7111: Reduce illumination to minimum necessary levels | $7,483 | $12,710 |
$4,981
64,183
kWh
|
$2,502
-
kW-mo/yr
|
- | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,612 | $500 |
$3,155
40,650
kWh
|
$457
-
kW-mo/yr
|
- | |
04 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $3,318 | $6,100 |
$1,516
19,539
kWh
|
$2,336
-
kW-mo/yr
|
$(-534.0)
-
MMBtu
|
|
05 | 2.2135: Repair and eliminate steam leaks | $2,867 | $200 | - | - |
$2,867
-
MMBtu
|
|
06 | 2.4239: Eliminate or reduce compressed air usage | $2,309 | $200 |
$1,581
20,377
kWh
|
$728
-
kW-mo/yr
|
- | |
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,888 | $400 |
$1,888
24,326
kWh
|
- | - | |
08 | 2.7134: Use photocell controls | $1,846 | $2,628 |
$1,229
15,835
kWh
|
$617
-
kW-mo/yr
|
- | |
09 | 2.2136: Install / repair insulation on steam lines | $1,214 | $2,058 | - | - |
$1,214
-
MMBtu
|
|
TOTAL RECOMMENDED | $48,592 | $81,720 |
$27,345
352,365
kWh
|
$13,754
-
kW-mo/yr
|
$7,493
-
MMBtu
|
||
TOTAL IMPLEMENTED | $42,172 | $73,162 |
$23,941
308,500
kWh
|
$11,418
-
kW-mo/yr
|
$6,813
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs