Assessment Year | 2012 |
---|---|
Principal Product | Pork Products |
NAICS | 311611: Animal (except Poultry) Slaughtering |
SIC | 2013: Sausages and Other Prepared Meat Products |
Sales Range | $100 M to 500M |
# of Employees | 643 |
Plant Area |
450,000
ft2
|
Annual Production | 740,000
lb
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,447,947 | 18,764,159 |
kWh
|
$0.077 |
Electricity Demand | $737,449 | 55,593 |
kW-mo/yr
|
$13.27 |
Electricity Fees | $65,990 | - |
|
- |
Natural Gas | $392,692 | 70,446 |
MMBtu
|
$5.57 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $392,678 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $11,667 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.5194: Redesign process | $272,976 | $164,279 |
$(-7,568.0)
(-98,035)
kWh
|
$(-1,782.0)
-
kW-mo/yr
|
$150,926
-
MMBtu
|
$131,400
-
Tgal
|
|
02 | 2.1223: Install smaller boiler (increase high fire duty cycle) | $46,732 | $123,300 | - | - |
$46,732
-
MMBtu
|
- | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $29,502 | $58,740 |
$25,377
328,718
kWh
|
$4,125
-
kW-mo/yr
|
- | - | |
04 | 2.2414: Use waste heat from hot flue gases to preheat | $22,833 | $11,000 | - | - |
$22,833
-
MMBtu
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $11,667 | $34,450 |
$8,768
113,579
kWh
|
$2,899
-
kW-mo/yr
|
- | - | |
06 | 2.2511: Insulate bare equipment | $7,861 | $8,422 | - | - |
$7,861
-
MMBtu
|
- | |
07 | 2.2163: Use minimum steam operating pressure | $1,107 | $200 | - | - |
$1,107
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $392,678 | $400,391 |
$26,577
344,262
kWh
|
$5,242
-
kW-mo/yr
|
$229,459
-
MMBtu
|
$131,400
-
Tgal
|
||
TOTAL IMPLEMENTED | $11,667 | $34,450 |
$8,768
113,579
kWh
|
$2,899
-
kW-mo/yr
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs