Assessment Year | 2012 |
---|---|
Principal Product | Roofing Granules |
NAICS | 324122: Asphalt Shingle and Coating Materials Manufacturing |
SIC | 2952: Asphalt Felts and Coatings |
Sales Range | $10 M to 50M |
# of Employees | 80 |
Plant Area |
653,400
ft2
|
Annual Production | 1,000,000
lb
|
Production Hrs. Annual | 4,000
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $957,448 | 13,854,771 |
kWh
|
$0.069 |
Electricity Demand | $496,000 | 41,962 |
kW-mo/yr
|
$11.82 |
Electricity Fees | $(-21,673.0) | - |
|
- |
Natural Gas | $1,181,602 | 230,185 |
MMBtu
|
$5.13 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $116,913 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $103,513 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4239: Eliminate or reduce compressed air usage | $19,250 | $200 |
$9,450
136,700
kWh
|
$9,800
-
kW-mo/yr
|
- | |
02 | 2.6218: Turn off equipment when not in use | $11,500 | $200 |
$11,500
166,400
kWh
|
- | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $5,950 | $200 |
$5,950
86,200
kWh
|
- | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $12,913 | $2,000 |
$9,550
138,100
kWh
|
$3,363
-
kW-mo/yr
|
- | |
05 | 2.2511: Insulate bare equipment | $49,200 | $24,400 | - | - |
$49,200
-
MMBtu
|
|
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $13,400 | $25,600 |
$13,400
194,600
kWh
|
- | - | |
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,700 | $12,150 |
$4,700
68,200
kWh
|
- | - | |
TOTAL RECOMMENDED | $116,913 | $64,750 |
$54,550
790,200
kWh
|
$13,163
-
kW-mo/yr
|
$49,200
-
MMBtu
|
||
TOTAL IMPLEMENTED | $103,513 | $39,150 |
$41,150
595,600
kWh
|
$13,163
-
kW-mo/yr
|
$49,200
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs