ITAC Assessment: SD0453
ITAC logo
ITAC Assessment: SD0453
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Roofing Granules
NAICS 324122: Asphalt Shingle and Coating Materials Manufacturing
SIC 2952: Asphalt Felts and Coatings
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 653,400
ft2
Annual Production 1,000,000
lb
Production Hrs. Annual 4,000
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $957,448 13,854,771
kWh
Electricity Demand $496,000 41,962
kW-mo/yr
Electricity Fees $(-21,673.0) -
Natural Gas $1,181,602 230,185
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $116,913 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $103,513

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4239: Eliminate or reduce compressed air usage $19,250 $200 $9,450
136,700
kWh
$9,800
-
kW-mo/yr
-
02 2.6218: Turn off equipment when not in use $11,500 $200 $11,500
166,400
kWh
- -
03 2.4231: Reduce the pressure of compressed air to the minimum required $5,950 $200 $5,950
86,200
kWh
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $12,913 $2,000 $9,550
138,100
kWh
$3,363
-
kW-mo/yr
-
05 2.2511: Insulate bare equipment $49,200 $24,400 - - $49,200
-
MMBtu
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $13,400 $25,600 $13,400
194,600
kWh
- -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,700 $12,150 $4,700
68,200
kWh
- -
TOTAL RECOMMENDED $116,913 $64,750 $54,550
790,200
kWh
$13,163
-
kW-mo/yr
$49,200
-
MMBtu
TOTAL IMPLEMENTED $103,513 $39,150 $41,150
595,600
kWh
$13,163
-
kW-mo/yr
$49,200
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs