ITAC Assessment: GT0349
ITAC logo
ITAC Assessment: GT0349
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product LATEX PAINT
NAICS
n/a
SIC 2851: Paints, Varnishes, Lacquers, Enamels, and Allied Products
Sales Range $10
M
to 50
M
# of Employees 67
Plant Area
n/a
Annual Production 11,500
Tgal
Production Hrs. Annual 5,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $32,841 344,959
kWh
Natural Gas $15,326 4,096
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,763 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,329

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.3191: Use demand controller or load shedder $4,814 $20,200 $4,814
-
kWh
02 2.4221: Install compressor air intakes in coolest locations $1,620 $1,500 $1,620
25,498
kWh
03 2.4133: Use most efficient type of electric motors $1,289 $1,426 $1,289
20,223
kWh
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,254 $1,329 $1,254
19,637
kWh
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $786 - $786
11,137
kWh
TOTAL RECOMMENDED $9,763 $24,455 $9,763
76,495
kWh
TOTAL IMPLEMENTED $3,329 $2,755 $3,329
50,997
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs