ITAC Assessment: SD0447
ITAC logo
ITAC Assessment: SD0447
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product O-Rings and Seals
NAICS 326299: All Other Rubber Product Manufacturing
SIC 3053: Gaskets, Packing, and Sealing Devices
Sales Range $10
M
to 50
M
# of Employees 188
Plant Area 40,000
ft2
Annual Production 80,000,000
pieces
Production Hrs. Annual 6,600
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $356,398 4,341,896
kWh
Electricity Demand $202,909 9,780
kW-mo/yr
Electricity Fees $(-58,379.0) -
Natural Gas $1,607 136
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $63,558 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.1121: Use insulation in furnaces to facilitate heating / cooling $1,132 $320 $1,132
13,795
kWh
- -
02 2.7145: Install skylights $14,679 $13,457 $14,679
178,794
kWh
- -
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $34,656 $38,885 $17,177
209,220
kWh
$27,390
-
kW-mo/yr
$(-9,911.0)
-
MMBtu
04 2.7135: Install occupancy sensors $472 $640 $472
5,766
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $8,491 $12,231 $5,109
62,235
kWh
$3,382
-
kW-mo/yr
-
06 2.7145: Install skylights $4,128 $7,660 $2,829
34,460
kWh
$1,299
-
kW-mo/yr
-
TOTAL RECOMMENDED $63,558 $73,193 $41,398
504,270
kWh
$32,071
-
kW-mo/yr
$(-9,911.0)
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs