ITAC Assessment: SD0445
ITAC logo
ITAC Assessment: SD0445
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Reclaimed Water
NAICS 221310: Water Supply and Irrigation Systems
SIC 4952: Sewerage Systems
Sales Range $1
M
to 5
M
# of Employees 38
Plant Area 26,136,000
ft2
Annual Production 105
units
Production Hrs. Annual 8,760
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $651,004 8,793,785
kWh
Electricity Demand $274,516 15,524
kW-mo/yr
Electricity Fees $14,499 -
Natural Gas $224,960 282,268
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $576,130 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $480,737

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.4131: Size electric motors for peak operating efficiency $33,123 $1,878 $24,955
337,223
kWh
$8,168
-
kW-mo/yr
- -
02 2.5194: Redesign process $30,890 $14,775 $670
9,070
kWh
$220
-
kW-mo/yr
- $30,000
03 2.1336: Install equipment to utilize waste fuel $64,503 $109,675 $(-120,896.8)
(-1,633,740)
kWh
$(-39,567.8)
-
kW-mo/yr
$224,968
-
MMBtu
-
04 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $351,013 $1,040,000 $354,911
4,796,100
kWh
$120,931
-
kW-mo/yr
- $(-124,830.0)
05 3.1191: Change procedures / equipment / operating conditions $11,844 $39,150 - - $11,844
-
MMBtu
-
06 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $84,757 $300,000 $310,183
4,191,660
kWh
$89,160
-
kW-mo/yr
- $(-314,585.5)
TOTAL RECOMMENDED $576,130 $1,505,478 $569,822
7,700,313
kWh
$178,911
-
kW-mo/yr
$236,812
-
MMBtu
$(-409,415.5)
TOTAL IMPLEMENTED $480,737 $1,381,028 $690,049
9,324,983
kWh
$218,259
-
kW-mo/yr
$11,844
-
MMBtu
$(-439,415.5)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings