| Assessment Year | 2012 |
|---|---|
| Principal Product | Reclaimed Water |
| NAICS | 221310: Water Supply and Irrigation Systems |
| SIC | 4952: Sewerage Systems |
| Sales Range | $1 M to 5M |
| # of Employees | 38 |
| Plant Area |
26,136,000
ft2
|
| Annual Production | 105
units
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $651,004 | 8,793,785 |
kWh
|
$0.074 |
| Electricity Demand | $274,516 | 15,524 |
kW-mo/yr
|
$17.68 |
| Electricity Fees | $14,499 | - |
|
- |
| Natural Gas | $224,960 | 282,268 |
MMBtu
|
$0.80 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $576,130 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $480,737 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.4131: Size electric motors for peak operating efficiency | $33,123 | $1,878 |
$24,955
337,223
kWh
|
$8,168
-
kW-mo/yr
|
- | - | |
| 02 | 2.5194: Redesign process | $30,890 | $14,775 |
$670
9,070
kWh
|
$220
-
kW-mo/yr
|
- | $30,000 | |
| 03 | 2.1336: Install equipment to utilize waste fuel | $64,503 | $109,675 |
$(-120,896.8)
(-1,633,740)
kWh
|
$(-39,567.8)
-
kW-mo/yr
|
$224,968
-
MMBtu
|
- | |
| 04 | 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $351,013 | $1,040,000 |
$354,911
4,796,100
kWh
|
$120,931
-
kW-mo/yr
|
- | $(-124,830.0) | |
| 05 | 3.1191: Change procedures / equipment / operating conditions | $11,844 | $39,150 | - | - |
$11,844
-
MMBtu
|
- | |
| 06 | 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $84,757 | $300,000 |
$310,183
4,191,660
kWh
|
$89,160
-
kW-mo/yr
|
- | $(-314,585.5) | |
| TOTAL RECOMMENDED | $576,130 | $1,505,478 |
$569,822
7,700,313
kWh
|
$178,911
-
kW-mo/yr
|
$236,812
-
MMBtu
|
$(-409,415.5) | ||
| TOTAL IMPLEMENTED | $480,737 | $1,381,028 |
$690,049
9,324,983
kWh
|
$218,259
-
kW-mo/yr
|
$11,844
-
MMBtu
|
$(-439,415.5) | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs