ITAC Assessment: SD0442
ITAC logo
ITAC Assessment: SD0442
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Valves
NAICS 332911: Industrial Valve Manufacturing
SIC 3491: Industrial Valves
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 30,000
ft2
Annual Production 10,000
units
Production Hrs. Annual 4,420
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $43,428 575,407
kWh
Electricity Demand $28,637 2,310
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,453 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7121: Utilize daylight whenever possible in lieu of artificial light $727 $100 $727
9,632
kWh
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,100 $100 $1,100
14,584
kWh
-
03 2.2691: Shut off cooling if cold outside air will cool process $247 $30 $247
3,267
kWh
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,022 $1,900 $2,467
32,675
kWh
$555
-
kW-mo/yr
05 2.7232: Replace existing hvac unit with high efficiency model $11,760 $26,500 $6,800
89,800
kWh
$4,960
-
kW-mo/yr
06 2.7135: Install occupancy sensors $597 $1,566 $597
7,907
kWh
-
TOTAL RECOMMENDED $17,453 $30,196 $11,938
157,865
kWh
$5,515
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs