ITAC Assessment: SD0440
ITAC logo
ITAC Assessment: SD0440
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Valves and Fittings for Gas Utilities
NAICS 332996: Fabricated Pipe and Pipe Fitting Manufacturing
SIC 3489: Ordnance and Accessories, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 70,000
ft2
Annual Production 10,000
units
Production Hrs. Annual 4,250
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $85,906 1,258,397
kWh
Electricity Demand $70,886 5,400
kW-mo/yr
Electricity Fees $6,703 -
Natural Gas $35,712 4,603
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $34,818 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7131: Add area lighting switches $157 $100 $157
2,295
kWh
- -
02 2.1121: Use insulation in furnaces to facilitate heating / cooling $1,314 $1,156 - - $1,314
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $23,205 $24,995 $15,041
220,218
kWh
$8,164
-
kW-mo/yr
-
04 2.7145: Install skylights $8,840 $24,421 $5,730
83,895
kWh
$3,110
-
kW-mo/yr
-
05 2.2414: Use waste heat from hot flue gases to preheat $1,302 $3,800 - - $1,302
-
MMBtu
TOTAL RECOMMENDED $34,818 $54,472 $20,928
306,408
kWh
$11,274
-
kW-mo/yr
$2,616
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs