ITAC Assessment: SD0437
ITAC logo
ITAC Assessment: SD0437
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Aerospace Sealants
NAICS 325520: Adhesive Manufacturing
SIC 2891: Adhesives and Sealants
Sales Range $1
M
to 5
M
# of Employees 95
Plant Area 50,000
ft2
Annual Production 1,000
units
Production Hrs. Annual 3,120
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $135,564 1,504,708
kWh
Electricity Demand $57,554 4,347
kW-mo/yr
Electricity Fees $24,390 -
Natural Gas $12,428 1,549
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $70,234 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $61,452

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7121: Utilize daylight whenever possible in lieu of artificial light $3,036 - $3,036
33,696
kWh
- -
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $58,730 $2,850 $69,614
772,632
kWh
$14,000
-
kW-mo/yr
$(-24,884.0)
-
MMBtu
03 2.7135: Install occupancy sensors $3,552 $214 $3,552
39,424
kWh
- -
04 2.1121: Use insulation in furnaces to facilitate heating / cooling $2,194 $610 $2,194
24,353
kWh
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,326 $700 $1,104
12,250
kWh
$222
-
kW-mo/yr
-
06 2.2437: Recover waste heat from equipment $1,396 $2,000 $1,396
15,489
kWh
- -
TOTAL RECOMMENDED $70,234 $6,374 $80,896
897,844
kWh
$14,222
-
kW-mo/yr
$(-24,884.0)
-
MMBtu
TOTAL IMPLEMENTED $61,452 $5,550 $72,114
800,371
kWh
$14,222
-
kW-mo/yr
$(-24,884.0)
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs