ITAC Assessment: SD0433
ITAC logo
ITAC Assessment: SD0433
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Operable Walls
NAICS 337212: Custom Architectural Woodwork and Millwork Manufacturing
SIC 2431: Millwork
Sales Range $10
M
to 50
M
# of Employees 56
Plant Area 51,600
ft2
Annual Production 136
units
Production Hrs. Annual 2,470
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $25,523 325,990
kWh
Electricity Demand $36,305 1,974
kW-mo/yr
Natural Gas $1,515 147
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,500 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,560

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.6212: Turn off equipment during breaks, reduce operating time $119 $10 $119
1,520
kWh
- -
02 2.2135: Repair and eliminate steam leaks $881 $300 $385
4,920
kWh
$496
-
kW-mo/yr
-
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $9,821 $5,000 $6,092
77,805
kWh
$6,952
-
kW-mo/yr
$(-3,223.0)
-
MMBtu
04 2.7135: Install occupancy sensors $3,508 $1,805 $547
6,989
kWh
$2,961
-
kW-mo/yr
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $171 $100 $171
2,187
kWh
- -
TOTAL RECOMMENDED $14,500 $7,215 $7,314
93,421
kWh
$10,409
-
kW-mo/yr
$(-3,223.0)
-
MMBtu
TOTAL IMPLEMENTED $4,560 $2,205 $1,103
14,096
kWh
$3,457
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs