ITAC Assessment: SD0426
ITAC logo
ITAC Assessment: SD0426
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product plastic films and bags
NAICS 326111: Plastics Bag and Pouch Manufacturing
SIC 3081: Unsupported Plastics Film and Sheet
Sales Range $10
M
to 50
M
# of Employees 40
Plant Area 50,000
ft2
Annual Production 17,000,000
lb
Production Hrs. Annual 6,120
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $289,886 3,627,390
kWh
Electricity Demand $158,625 10,839
kW-mo/yr
Electricity Fees $49,448 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $87,219 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,801

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $2,373 $100 $2,373
29,697
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,943 $1,000 $4,377
54,786
kWh
$1,566
-
kW-mo/yr
03 2.7145: Install skylights $10,372 $7,660 $10,372
95,555
kWh
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $33,632 $94,584 $24,152
302,282
kWh
$9,480
-
kW-mo/yr
05 2.4133: Use most efficient type of electric motors $21,414 $59,920 $15,357
192,207
kWh
$6,057
-
kW-mo/yr
06 2.7142: Utilize higher efficiency lamps and/or ballasts $13,485 $54,987 $9,899
123,887
kWh
$3,586
-
kW-mo/yr
TOTAL RECOMMENDED $87,219 $218,251 $66,530
798,414
kWh
$20,689
-
kW-mo/yr
TOTAL IMPLEMENTED $21,801 $56,087 $16,649
208,370
kWh
$5,152
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs