ITAC Assessment: SD0425
ITAC logo
ITAC Assessment: SD0425
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Waste water, Reclaimed water
NAICS 221310: Water Supply and Irrigation Systems
SIC 3589: Service Industry Machinery, Not Elsewhere Classified
Sales Range less than $500
k
# of Employees 19
Plant Area 10,000
ft2
Annual Production 4,380,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $637,470 7,586,488
kWh
Electricity Demand $322,754 19,568
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $51,455 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $42,981

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $3,908 $100 $3,908
46,518
kWh
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,098 $100 $1,098
13,069
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,468 $1,000 $3,468
41,280
kWh
-
04 2.7135: Install occupancy sensors $496 $1,334 $496
5,906
kWh
-
05 2.7232: Replace existing hvac unit with high efficiency model $42,485 $260,000 $33,480
398,580
kWh
$9,005
-
kW-mo/yr
TOTAL RECOMMENDED $51,455 $262,534 $42,450
505,353
kWh
$9,005
-
kW-mo/yr
TOTAL IMPLEMENTED $42,981 $261,334 $33,976
404,486
kWh
$9,005
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs