ITAC Assessment: SD0416
ITAC logo
ITAC Assessment: SD0416
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Roasting and seasoning nuts and seeds
NAICS 311911: Roasted Nuts and Peanut Butter Manufacturing
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 135
Plant Area 69,000
ft2
Annual Production 350
pieces
Production Hrs. Annual 4,335
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $59,327 552,120
kWh
Electricity Demand $19,410 1,953
kW-mo/yr
Electricity Fees $3,281 -
Natural Gas $35,800 30,276
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $45,210 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,624

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $7,133 $35,628 $7,133
51,683
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $4,893 $5,295 $4,893
35,679
kWh
03 2.7134: Use photocell controls $3,458 $4,950 $3,458
32,026
kWh
04 2.7425: Clean or color roof to reduce solar load $28,586 $26,000 $28,586
225,789
kWh
05 2.7232: Replace existing hvac unit with high efficiency model $655 - $655
4,590
kWh
06 2.4231: Reduce the pressure of compressed air to the minimum required $485 - $485
4,517
kWh
TOTAL RECOMMENDED $45,210 $71,873 $45,210
354,284
kWh
TOTAL IMPLEMENTED $16,624 $45,873 $16,624
128,495
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs