Assessment Year | 2009 |
---|---|
Principal Product | Aluminum Die Castings |
NAICS | 331523: Nonferrous Metal Die-Casting Foundries |
SIC | 3363: Aluminum Die-Castings |
Sales Range | $10 M to 50M |
# of Employees | 94 |
Plant Area |
70,000
ft2
|
Annual Production | 2,400,000
lb
|
Production Hrs. Annual | 3,840
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $271,521 | 3,354,451 |
kWh
|
$0.081 |
Electricity Demand | $149,592 | 8,818 |
kW-mo/yr
|
$16.96 |
Electricity Fees | $6,789 | - |
|
- |
Natural Gas | $425,831 | 40,939 |
MMBtu
|
$10.40 |
Other Gas | $18,697 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $94,156 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $17,931 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $41,473 | $350,000 |
$59,024
729,600
kWh
|
$40,714
-
kW-mo/yr
|
$(-6,658.0) |
$(-51,607.0)
-
MMBtu
|
|
02 | 2.1133: Adjust burners for efficient operation | $21,022 | $10,000 | - | - | - |
$21,022
-
MMBtu
|
|
03 | 2.4133: Use most efficient type of electric motors | $8,233 | $13,039 |
$4,620
57,105
kWh
|
$3,613
-
kW-mo/yr
|
- | - | |
04 | 2.2424: Use heat in flue gases to preheat products or materials | $13,730 | $70,000 | - | - | - |
$13,730
-
MMBtu
|
|
05 | 2.4226: Use / purchase optimum sized compressor | $6,333 | - |
$6,333
78,285
kWh
|
- | - | - | |
06 | 2.7145: Install skylights | $3,365 | $9,170 |
$2,177
26,905
kWh
|
$1,188
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $94,156 | $452,209 |
$72,154
891,895
kWh
|
$45,515
-
kW-mo/yr
|
$(-6,658.0) |
$(-16,855.0)
-
MMBtu
|
||
TOTAL IMPLEMENTED | $17,931 | $22,209 |
$13,130
162,295
kWh
|
$4,801
-
kW-mo/yr
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs