ITAC Assessment: SD0405
ITAC logo
ITAC Assessment: SD0405
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Newspaper Printing Plates
NAICS 323120: Support Activities for Printing
SIC 2672: Coated and Laminated Paper, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 185,000
ft2
Annual Production 6,000,000
pieces
Production Hrs. Annual 7,200
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $366,374 4,526,567
kWh
Electricity Demand $191,931 29,952
kW-mo/yr
Electricity Fees $66,701 -
Natural Gas $222,747 25,832
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $226,344 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $217,227

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $117,665 $1,117,600 $78,590
3,474,720
kWh
$39,075
-
kW-mo/yr
-
02 2.5111: Convert from indirect to direct fired systems $62,965 $69,500 - - $62,965
-
MMBtu
03 2.4133: Use most efficient type of electric motors $16,824 $22,665 $14,850
183,561
kWh
$1,974
-
kW-mo/yr
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $11,507 $900 $10,165
125,651
kWh
$1,342
-
kW-mo/yr
-
05 2.2414: Use waste heat from hot flue gases to preheat $7,660 $4,270 - - $7,660
-
MMBtu
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,270 $4,650 $5,270
65,152
kWh
- -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,436 $3,324 $2,436
30,112
kWh
- -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $1,411 $3,110 $1,244
15,380
kWh
$167
-
kW-mo/yr
-
09 2.7135: Install occupancy sensors $606 $256 $606
7,349
kWh
- -
TOTAL RECOMMENDED $226,344 $1,226,275 $113,161
3,901,925
kWh
$42,558
-
kW-mo/yr
$70,625
-
MMBtu
TOTAL IMPLEMENTED $217,227 $1,215,191 $104,211
3,791,281
kWh
$42,391
-
kW-mo/yr
$70,625
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs