| Assessment Year | 2007 |
|---|---|
| Principal Product | steel precision investment casting |
| NAICS | 331512: Steel Investment Foundries |
| SIC | 3324: Steel Investment Foundries |
| Sales Range | $10 M to 50M |
| # of Employees | 184 |
| Plant Area |
162,000
ft2
|
| Annual Production | 1
units
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | Arizona |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $535,580 | 9,062,279 |
kWh
|
$0.059 |
| Electricity Demand | $195,076 | 44,538 |
kW-mo/yr
|
$4.38 |
| Natural Gas | $335,142 | 8,193,500 |
MMBtu
|
$0.041 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $154,822 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $21,792 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.2422: Use waste heat from hot flue gases to generate steam | $51,686 | $51,240 | - | - |
$51,686
-
MMBtu
|
|
| 02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $52,328 | $44,175 |
$52,328
314,818
kWh
|
- | - | |
| 03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,149 | $18,100 |
$3,149
58,284
kWh
|
- | - | |
| 04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $19,700 | $23,250 |
$19,700
333,333
kWh
|
- | - | |
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $7,897 | $420 |
$6,878
116,376
kWh
|
$1,019
-
kW-mo/yr
|
- | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,198 | $17,214 |
$6,269
106,080
kWh
|
$929
-
kW-mo/yr
|
- | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,697 | $71,224 |
$5,832
98,682
kWh
|
$865
-
kW-mo/yr
|
- | |
| 08 | 2.7145: Install skylights | $4,924 | $13,330 |
$4,289
72,576
kWh
|
$635
-
kW-mo/yr
|
- | |
| 09 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,243 | $3,825 |
$1,081
18,307
kWh
|
$162
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $154,822 | $242,778 |
$99,526
1,118,456
kWh
|
$3,610
-
kW-mo/yr
|
$51,686
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $21,792 | $88,858 |
$18,979
321,138
kWh
|
$2,813
-
kW-mo/yr
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs