ITAC Assessment: SD0397
ITAC logo
ITAC Assessment: SD0397
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product steel precision investment casting
NAICS 331512: Steel Investment Foundries
SIC 3324: Steel Investment Foundries
Sales Range $10
M
to 50
M
# of Employees 184
Plant Area 162,000
ft2
Annual Production 1
units
Production Hrs. Annual 6,000
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $535,580 9,062,279
kWh
Electricity Demand $195,076 44,538
kW-mo/yr
Natural Gas $335,142 8,193,500
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $154,822 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,792

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2422: Use waste heat from hot flue gases to generate steam $51,686 $51,240 - - $51,686
-
MMBtu
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $52,328 $44,175 $52,328
314,818
kWh
- -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,149 $18,100 $3,149
58,284
kWh
- -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $19,700 $23,250 $19,700
333,333
kWh
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,897 $420 $6,878
116,376
kWh
$1,019
-
kW-mo/yr
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $7,198 $17,214 $6,269
106,080
kWh
$929
-
kW-mo/yr
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $6,697 $71,224 $5,832
98,682
kWh
$865
-
kW-mo/yr
-
08 2.7145: Install skylights $4,924 $13,330 $4,289
72,576
kWh
$635
-
kW-mo/yr
-
09 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,243 $3,825 $1,081
18,307
kWh
$162
-
kW-mo/yr
-
TOTAL RECOMMENDED $154,822 $242,778 $99,526
1,118,456
kWh
$3,610
-
kW-mo/yr
$51,686
-
MMBtu
TOTAL IMPLEMENTED $21,792 $88,858 $18,979
321,138
kWh
$2,813
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs