ITAC Assessment: SD0394
ITAC logo
ITAC Assessment: SD0394
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product valves
NAICS 332911: Industrial Valve Manufacturing
SIC 3491: Industrial Valves
Sales Range $50
M
to 100
M
# of Employees 350
Plant Area 120,000
ft2
Annual Production 1,500
pieces
Production Hrs. Annual 6,000
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $378,757 3,927,212
kWh
Electricity Demand $126,252 9,037
kW-mo/yr
Natural Gas $23,199 2,263
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $116,277 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $72,155 $103,750 $69,588
721,875
kWh
$32,270
-
kW-mo/yr
$(-29,703.0)
-
MMBtu
02 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $33,374 $226,540 $121,240
1,257,675
kWh
$35,134
-
kW-mo/yr
$(-123,000.0)
-
MMBtu
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,868 $3,046 $5,868
60,873
kWh
- -
04 2.4231: Reduce the pressure of compressed air to the minimum required $4,578 - $4,578
47,493
kWh
- -
05 2.6218: Turn off equipment when not in use $302 $200 $302
3,133
kWh
- -
TOTAL RECOMMENDED $116,277 $333,536 $201,576
2,091,049
kWh
$67,404
-
kW-mo/yr
$(-152,703.0)
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs