ITAC Assessment: SD0393
ITAC logo
ITAC Assessment: SD0393
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Petroleum based lubricants
NAICS 324191: Petroleum Lubricating Oil and Grease Manufacturing
SIC 2992: Lubricating Oils and Greases
Sales Range $10
M
to 50
M
# of Employees 44
Plant Area 400,000
ft2
Annual Production 36,000
Tgal
Production Hrs. Annual 6,240
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $133,127 2,163,229
kWh
Electricity Demand $93,649 6,102
kW-mo/yr
Natural Gas $150,460 17,513
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $38,595 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $15,720 $27,048 $9,172
95,047
kWh
$6,548
-
kW-mo/yr
02 2.7142: Utilize higher efficiency lamps and/or ballasts $9,106 $20,570 $5,304
54,962
kWh
$3,802
-
kW-mo/yr
03 2.7142: Utilize higher efficiency lamps and/or ballasts $8,476 $12,702 $4,341
44,984
kWh
$4,135
-
kW-mo/yr
04 2.4231: Reduce the pressure of compressed air to the minimum required $5,293 - $5,293
54,855
kWh
-
TOTAL RECOMMENDED $38,595 $60,320 $24,110
249,848
kWh
$14,485
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs