ITAC Assessment: SD0383
ITAC logo
ITAC Assessment: SD0383
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product aluminum forgings
NAICS 332112: Nonferrous Forging
SIC 3463: Nonferrous Forgings
Sales Range $50
M
to 100
M
# of Employees 350
Plant Area 100,000
ft2
Annual Production 0
units
Production Hrs. Annual 0
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $474,210 6,451,835
kWh
Electricity Demand $333,201 18,975
kW-mo/yr
Natural Gas $1,229,510 135,111
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $79,353 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $33,958 - $25,318
344,468
kWh
$8,640
-
kW-mo/yr
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $17,420 $260 $11,976
162,943
kWh
$5,444
-
kW-mo/yr
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $14,249 $26,550 $14,249
193,867
kWh
- -
04 2.4238: Do not use compressed air for personal cooling $5,803 $900 $5,803
78,957
kWh
- -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,966 $4,300 $3,966
53,972
kWh
- -
06 2.2437: Recover waste heat from equipment $3,957 $4,270 - - $3,957
-
MMBtu
TOTAL RECOMMENDED $79,353 $36,280 $61,312
834,207
kWh
$14,084
-
kW-mo/yr
$3,957
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs