ITAC Assessment: SD0379
ITAC logo
ITAC Assessment: SD0379
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Aerospace hydraulic actuators
NAICS 333995: Fluid Power Cylinder and Actuator Manufacturing
SIC 3593: Fluid Power Cylinders and Actuators
Sales Range $100
M
to 500
M
# of Employees 1,400
Plant Area 370,000
ft2
Annual Production 0
units
Production Hrs. Annual 7,956
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,195,034 20,934,534
kWh
Electricity Demand $476,773 47,648
kW-mo/yr
Natural Gas $2,093 3,965
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $610,425 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,974

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.7232: Replace existing hvac unit with high efficiency model $212,485 $900,288 $134,847
1,285,490
kWh
$77,638
-
kW-mo/yr
-
02 2.8114: Change rate schedules or other changes in utility service $169,122 - - - $169,122
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $110,534 $160,385 $110,534
1,053,710
kWh
- -
04 2.7425: Clean or color roof to reduce solar load $82,170 $150,000 $82,170
783,321
kWh
- -
05 2.4231: Reduce the pressure of compressed air to the minimum required $23,140 $18,110 $23,140
220,599
kWh
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $12,974 $220 $11,472
109,359
kWh
$1,502
-
kW-mo/yr
-
TOTAL RECOMMENDED $610,425 $1,229,003 $362,163
3,452,479
kWh
$79,140
-
kW-mo/yr
$169,122
TOTAL IMPLEMENTED $12,974 $220 $11,472
109,359
kWh
$1,502
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs