Assessment Year | 2005 |
---|---|
Principal Product | Integrated Circuit test handling units |
NAICS | 332913: Plumbing Fixture Fitting and Trim Manufacturing |
SIC | 3569: General Industrial Machinery and Equipment, Not Elsewhere |
Sales Range | $50 M to 100M |
# of Employees | 500 |
Plant Area |
338,000
ft2
|
Annual Production | 120
pieces
|
Production Hrs. Annual | 7,200
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $790,690 | 8,712,713 |
kWh
|
$0.091 |
Electricity Demand | $277,396 | 18,222 |
kW-mo/yr
|
$15.22 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $222,844 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $28,867 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|
01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $169,717 | $252,000 |
$132,656
1,460,966
kWh
|
$37,061
-
kW-mo/yr
|
- | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $17,291 | - |
$17,291
190,433
kWh
|
- | - | |
03 | 2.4221: Install compressor air intakes in coolest locations | $6,639 | $648 |
$5,189
57,150
kWh
|
$1,450
-
kW-mo/yr
|
- | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,877 | $12,575 |
$4,877
53,712
kWh
|
- | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $10,896 | $10,102 |
$8,522
93,852
kWh
|
$2,374
-
kW-mo/yr
|
- | |
06 | 2.7135: Install occupancy sensors | $395 | $80 |
$395
4,355
kWh
|
- | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $285 | $161 |
$197
2,164
kWh
|
$88
-
kW-mo/yr
|
- | |
08 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $12,744 | $17,000 | - | - |
$12,744
-
lb
|
|
TOTAL RECOMMENDED | $222,844 | $292,566 |
$169,127
1,862,632
kWh
|
$40,973
-
kW-mo/yr
|
$12,744
-
lb
|
||
TOTAL IMPLEMENTED | $28,867 | $10,343 |
$26,405
290,804
kWh
|
$2,462
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs