Assessment Year | 2005 |
---|---|
Principal Product | Sugar |
NAICS | 311314: Cane Sugar Manufacturing |
SIC | 2062: Cane Sugar Refining |
Sales Range | $50 M to 100M |
# of Employees | 250 |
Plant Area |
600,000
ft2
|
Annual Production | 1,400,000
ton
|
Production Hrs. Annual | 3,696
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Natural Gas | $359,170 | 601,421 |
MMBtu
|
$0.60 |
Fuel Oil #2 | $178,551 | 31,665 |
MMBtu
|
$5.64 |
Coal | $1,873,185 | 702,822 |
MMBtu
|
$2.67 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $1,138,884 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | By-product Production Savings | Increase in Production Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.2135: Repair and eliminate steam leaks | $85,079 | $99,260 | - |
$85,079
-
MMBtu
|
- | - | - | - | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $82,308 | $130,000 |
$82,308
1,704,091
kWh
|
- | - | - | - | - | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $49,689 | $30,500 |
$49,689
1,028,768
kWh
|
- | - | - | - | - | |
04 | 2.2113: Repair or replace steam traps | $41,386 | $11,940 | - |
$41,386
-
MMBtu
|
- | - | - | - | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $39,379 | $59,781 |
$39,379
815,305
kWh
|
- | - | - | - | - | |
06 | 2.2136: Install / repair insulation on steam lines | $5,259 | $4,056 | - |
$5,259
-
MMBtu
|
- | - | - | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,660 | $13,282 |
$6,660
137,889
kWh
|
- | - | - | - | - | |
08 | 3.5317: Sell / offer by-product as animal feed | $539,275 | $68,000 | - | - | - | - | $539,275 | - | |
09 | 3.1182: Make a new by-product | $194,263 | $172,000 | - | - | - | - | - | $194,263 | |
10 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $15,102 | $20,000 | - | - |
$15,102
-
lb
|
- | - | - | |
11 | 4.445: Install equipment to move product | $80,484 | $5,965 | - | - | - | $80,484 | - | - | |
TOTAL RECOMMENDED | $1,138,884 | $614,784 |
$178,036
3,686,053
kWh
|
$131,724
-
MMBtu
|
$15,102
-
lb
|
$80,484 | $539,275 | $194,263 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | By-product Production Savings | Increase in Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs