ITAC Assessment: SD0367
ITAC logo
ITAC Assessment: SD0367
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Faucets and Coatings
NAICS 332913: Plumbing Fixture Fitting and Trim Manufacturing
SIC 3432: Plumbing Fixture Fittings and Trim
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 57,000
ft2
Annual Production 357
ton
Production Hrs. Annual 7,344
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $100,866 1,207,016
kWh
Electricity Demand $54,929 3,843
kW-mo/yr
Natural Gas $22,360 28,451
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $61,750 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings By-product Production Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $15,944 $23,500 $12,463
149,083
kWh
$3,481
-
kW-mo/yr
- - -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $9,834 $15,130 $5,890
70,455
kWh
$3,944
-
kW-mo/yr
- - -
03 2.2614: Use cooling tower or economizer to replace chiller cooling $7,652 $8,000 $4,580
54,787
kWh
$3,072
-
kW-mo/yr
- - -
04 2.2514: Cover open tanks $5,688 $3,722 - - $5,688
-
MMBtu
- -
05 2.4133: Use most efficient type of electric motors $3,803 $1,750 $2,974
35,575
kWh
$829
-
kW-mo/yr
- - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,567 $100 $1,260
15,067
kWh
$307
-
kW-mo/yr
- - -
07 2.2511: Insulate bare equipment $448 $47 - - $448
-
MMBtu
- -
08 3.6193: Install equipment (eg compactor) to reduce disposal costs $377 $525 $295
3,523
kWh
$82
-
kW-mo/yr
- - -
09 3.5313: Increase amount of waste recovered for resale $663 $60 $663
7,932
kWh
- - - -
10 4.322: Eliminate old stock and modify inventory control $15,774 $17,000 - - - $5,598
-
lb
$10,176
TOTAL RECOMMENDED $61,750 $69,834 $28,125
336,422
kWh
$11,715
-
kW-mo/yr
$6,136
-
MMBtu
$5,598
-
lb
$10,176
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs