Assessment Year | 2005 |
---|---|
Principal Product | Faucets and Coatings |
NAICS | 332913: Plumbing Fixture Fitting and Trim Manufacturing |
SIC | 3432: Plumbing Fixture Fittings and Trim |
Sales Range | $10 M to 50M |
# of Employees | 50 |
Plant Area |
57,000
ft2
|
Annual Production | 357
ton
|
Production Hrs. Annual | 7,344
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $100,866 | 1,207,016 |
kWh
|
$0.084 |
Electricity Demand | $54,929 | 3,843 |
kW-mo/yr
|
$14.29 |
Natural Gas | $22,360 | 28,451 |
MMBtu
|
$0.79 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $61,750 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | By-product Production Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $15,944 | $23,500 |
$12,463
149,083
kWh
|
$3,481
-
kW-mo/yr
|
- | - | - | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $9,834 | $15,130 |
$5,890
70,455
kWh
|
$3,944
-
kW-mo/yr
|
- | - | - | |
03 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $7,652 | $8,000 |
$4,580
54,787
kWh
|
$3,072
-
kW-mo/yr
|
- | - | - | |
04 | 2.2514: Cover open tanks | $5,688 | $3,722 | - | - |
$5,688
-
MMBtu
|
- | - | |
05 | 2.4133: Use most efficient type of electric motors | $3,803 | $1,750 |
$2,974
35,575
kWh
|
$829
-
kW-mo/yr
|
- | - | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,567 | $100 |
$1,260
15,067
kWh
|
$307
-
kW-mo/yr
|
- | - | - | |
07 | 2.2511: Insulate bare equipment | $448 | $47 | - | - |
$448
-
MMBtu
|
- | - | |
08 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $377 | $525 |
$295
3,523
kWh
|
$82
-
kW-mo/yr
|
- | - | - | |
09 | 3.5313: Increase amount of waste recovered for resale | $663 | $60 |
$663
7,932
kWh
|
- | - | - | - | |
10 | 4.322: Eliminate old stock and modify inventory control | $15,774 | $17,000 | - | - | - |
$5,598
-
lb
|
$10,176 | |
TOTAL RECOMMENDED | $61,750 | $69,834 |
$28,125
336,422
kWh
|
$11,715
-
kW-mo/yr
|
$6,136
-
MMBtu
|
$5,598
-
lb
|
$10,176 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | By-product Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs