ITAC Assessment: SD0364
ITAC logo
ITAC Assessment: SD0364
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Rubber Grommets
NAICS 326299: All Other Rubber Product Manufacturing
SIC 3262: Vitreous China Table and Kitchen Articles
Sales Range $5
M
to 10
M
# of Employees 67
Plant Area 80,000
ft2
Annual Production 100,000
ton
Production Hrs. Annual 4,800
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $74,504 778,170
kWh
Electricity Demand $46,764 2,918
kW-mo/yr
Natural Gas $21,294 27,841
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,656 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,093

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $8,817 $17,315 $6,333
66,175
kWh
$2,484
-
kW-mo/yr
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $8,150 $5,650 $8,150
85,165
kWh
-
03 2.4131: Size electric motors for peak operating efficiency $3,260 $6,300 $2,392
25,000
kWh
$868
-
kW-mo/yr
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,016 $440 $1,448
15,145
kWh
$568
-
kW-mo/yr
05 2.7135: Install occupancy sensors $413 $400 $413
4,320
kWh
-
TOTAL RECOMMENDED $22,656 $30,105 $18,736
195,805
kWh
$3,920
-
kW-mo/yr
TOTAL IMPLEMENTED $14,093 $24,055 $10,173
106,320
kWh
$3,920
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs