ITAC Assessment: SD0356
ITAC logo
ITAC Assessment: SD0356
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product corrugated boxes and containers
NAICS 322211: Corrugated and Solid Fiber Box Manufacturing
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 70
Plant Area 125,000
ft2
Annual Production 30,000,000
pieces
Production Hrs. Annual 4,335
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $176,184 1,996,579
kWh
Electricity Demand $85,757 8,236
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $46,467 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,734

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings
01 2.4224: Upgrade controls on compressors $5,391 $11,000 $5,391
61,121
kWh
- - - -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,992 $14,000 $4,992
56,593
kWh
- - - -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,583 $7,647 $2,698
30,656
kWh
$885
-
kW-mo/yr
- - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,351 $120 $1,771
20,082
kWh
$580
-
kW-mo/yr
- - -
05 2.4231: Reduce the pressure of compressed air to the minimum required $1,151 - $1,151
13,046
kWh
- - - -
06 3.3131: Use evaporation to concentrate material $18,769 $25,650 $2,138
24,245
kWh
$700
-
kW-mo/yr
$(-8,069.0)
-
MMBtu
$24,000
-
gal
-
07 3.6193: Install equipment (eg compactor) to reduce disposal costs $10,230 $18,500 - - - - $10,230
-
lb
TOTAL RECOMMENDED $46,467 $76,917 $18,141
205,743
kWh
$2,165
-
kW-mo/yr
$(-8,069.0)
-
MMBtu
$24,000
-
gal
$10,230
-
lb
TOTAL IMPLEMENTED $12,734 $25,120 $12,154
137,796
kWh
$580
-
kW-mo/yr
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs