ITAC Assessment: SD0352
ITAC logo
ITAC Assessment: SD0352
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product food service disposable plastic containers
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 180
Plant Area 180,000
ft2
Annual Production 1,600,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,164,702 11,482,180
kWh
Electricity Demand $322,278 27,334
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $983,901 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $42,871

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $820,692 $1,776,190 n/a $857,528
8,456,885
kWh
$144,168
-
kW-mo/yr
$(-54,151.0)
-
MMBtu
- $(-126,853.0)
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $57,650 $36,750 n/a $49,586
489,010
kWh
$8,064
-
kW-mo/yr
- - -
03 2.4231: Reduce the pressure of compressed air to the minimum required $19,672 - $19,672
194,000
kWh
- - - -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $13,107 $10,200 $13,107
129,259
kWh
- - - -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $10,768 $28,000 n/a $10,768
106,193
kWh
- - - -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,493 $7,900 $6,493
64,037
kWh
- - - -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,377 $360 $4,638
45,748
kWh
$739
-
kW-mo/yr
- - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $37,494 $49,732 $32,472
310,233
kWh
$5,022
-
kW-mo/yr
- - -
09 3.6193: Install equipment (eg compactor) to reduce disposal costs $12,648 $18,500 - - - $12,648
-
lb
-
TOTAL RECOMMENDED $983,901 $1,927,632 $994,264
9,795,365
kWh
$157,993
-
kW-mo/yr
$(-54,151.0)
-
MMBtu
$12,648
-
lb
$(-126,853.0)
TOTAL IMPLEMENTED $42,871 $50,092 $37,110
355,981
kWh
$5,761
-
kW-mo/yr
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs