ITAC Assessment: SD0351
ITAC logo
ITAC Assessment: SD0351
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Bricks
NAICS 327120: Clay Building Material and Refractories Manufacturing
SIC 3251: Brick and Structural Clay Tile
Sales Range $10
M
to 50
M
# of Employees 40
Plant Area 150,000
ft2
Annual Production 80,000,000
pieces
Production Hrs. Annual 7,224
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $114,480 1,594,732
kWh
Electricity Demand $72,118 7,425
kW-mo/yr
Natural Gas $488,108 89,289
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $344,943 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $127,079

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.2414: Use waste heat from hot flue gases to preheat $217,864 $75,000 - - $217,864
-
MMBtu
-
02 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $80,766 $255,442 $107,765
1,502,997
kWh
$25,518
-
kW-mo/yr
$(-52,517.0)
-
MMBtu
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $34,754 $39,050 $28,375
395,752
kWh
$6,379
-
kW-mo/yr
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $7,248 $14,785 $5,918
82,541
kWh
$1,330
-
kW-mo/yr
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,257 $350 $1,393
20,825
kWh
$864
-
kW-mo/yr
- -
06 2.4231: Reduce the pressure of compressed air to the minimum required $663 - $663
9,243
kWh
- - -
07 2.8123: Pay utility bills on time $1,391 - - - - $1,391
TOTAL RECOMMENDED $344,943 $384,627 $144,114
2,011,358
kWh
$34,091
-
kW-mo/yr
$165,347
-
MMBtu
$1,391
TOTAL IMPLEMENTED $127,079 $309,627 $144,114
2,011,358
kWh
$34,091
-
kW-mo/yr
$(-52,517.0)
-
MMBtu
$1,391
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs