Assessment Year | 2004 |
---|---|
Principal Product | plastics films |
NAICS | 326111: Plastics Bag and Pouch Manufacturing |
SIC | 3081: Unsupported Plastics Film and Sheet |
Sales Range | $10 M to 50M |
# of Employees | 100 |
Plant Area |
200,000
ft2
|
Annual Production | 40,000,000
ton
|
Production Hrs. Annual | 8,568
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,273,015 | 13,930,883 |
kWh
|
$0.091 |
Electricity Demand | $330,130 | 25,262 |
kW-mo/yr
|
$13.07 |
Natural Gas | $345 | 38 |
MMBtu
|
$9.08 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $171,051 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $33,091 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $17,785 | $320 |
$14,816
162,094
kWh
|
$2,969
-
kW-mo/yr
|
- | |
02 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $15,306 | $9,465 |
$9,803
107,258
kWh
|
$5,503
-
kW-mo/yr
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,189 | $413 |
$1,189
13,010
kWh
|
- | - | |
04 | 2.7145: Install skylights | $8,771 | $21,250 |
$8,771
95,962
kWh
|
- | - | |
05 | 4.441: Install automatic packing equipment | $128,000 | $115,000 | - | - | $128,000 | |
TOTAL RECOMMENDED | $171,051 | $146,448 |
$34,579
378,324
kWh
|
$8,472
-
kW-mo/yr
|
$128,000 | ||
TOTAL IMPLEMENTED | $33,091 | $9,785 |
$24,619
269,352
kWh
|
$8,472
-
kW-mo/yr
|
- |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs