Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product plastics films
NAICS 326111: Plastics Bag and Pouch Manufacturing
SIC 3081: Unsupported Plastics Film and Sheet
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 200,000
ft2
Annual Production 40,000,000
ton
Production Hrs. Annual 8,568
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,273,015 13,930,883
kWh
Electricity Demand $330,130 25,262
kW-mo/yr
Natural Gas $345 38
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $171,051 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $33,091

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $17,785 $320 $14,816
162,094
kWh
$2,969
-
kW-mo/yr
-
02 2.2614: Use cooling tower or economizer to replace chiller cooling $15,306 $9,465 $9,803
107,258
kWh
$5,503
-
kW-mo/yr
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,189 $413 $1,189
13,010
kWh
- -
04 2.7145: Install skylights $8,771 $21,250 $8,771
95,962
kWh
- -
05 4.441: Install automatic packing equipment $128,000 $115,000 - - $128,000
TOTAL RECOMMENDED $171,051 $146,448 $34,579
378,324
kWh
$8,472
-
kW-mo/yr
$128,000
TOTAL IMPLEMENTED $33,091 $9,785 $24,619
269,352
kWh
$8,472
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs