Assessment Year | 2004 |
---|---|
Principal Product | Perfumes and cosmetics |
NAICS | 325620: Toilet Preparation Manufacturing |
SIC | 2844: Perfumes, Cosmetics, and Other Toilet Preparations |
Sales Range | $100 M to 500M |
# of Employees | 100 |
Plant Area |
130,000
ft2
|
Annual Production | 10,200,000
pieces
|
Production Hrs. Annual | 5,250
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $129,673 | 1,570,661 |
kWh
|
$0.083 |
Electricity Demand | $40,840 | 7,026 |
kW-mo/yr
|
$5.81 |
Natural Gas | $35,169 | 4,865 |
MMBtu
|
$7.23 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $196,683 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,576 | $440 |
$4,443
53,791
kWh
|
$1,133
-
kW-mo/yr
|
- | - | - | - | |
02 | 2.7141: Lower light fixtures in high ceiling areas | $15,314 | $46,898 |
$12,979
157,126
kWh
|
$2,335
-
kW-mo/yr
|
- | - | - | - | |
03 | 2.2135: Repair and eliminate steam leaks | $2,381 | $2,113 | - | - |
$2,381
-
MMBtu
|
- | - | - | |
04 | 3.3131: Use evaporation to concentrate material | $11,520 | $12,000 | - | - | - |
$11,520
-
gal
|
- | - | |
05 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $10,692 | $18,500 | - | - | - | - |
$10,692
-
lb
|
- | |
06 | 3.2176: Increase use of automation | $75,100 | $65,000 | - | - | - | - | - | $75,100 | |
07 | 3.2176: Increase use of automation | $38,050 | $25,000 | - | - | - | - | - | $38,050 | |
08 | 3.2176: Increase use of automation | $38,050 | $40,000 | - | - | - | - | - | $38,050 | |
TOTAL RECOMMENDED | $196,683 | $209,951 |
$17,422
210,917
kWh
|
$3,468
-
kW-mo/yr
|
$2,381
-
MMBtu
|
$11,520
-
gal
|
$10,692
-
lb
|
$151,200 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs